F        TURN ON OR OFF
NON PAYMENT $45.00
WORK HOURS * $40.00 *WORK HOURS ARE 7:OOAM TO 3:30PM
AFTER HOURS  $60.00  MONDAY THRU FRIDAY EXCEPT HOLIDAYS
SEASONAL LIST $25.00 $50 per year
SEASONAL Rescheduled $50.00
G             REPAIRS  WORK HRS  AFTER HRS
DEPARTMENT LABOR CHARGE  $65/HOUR  $85.00
PIPE THAWING EQUIPMENT          $50 / HOUR  PLUS LABOR 
FREEZEPLATE REPLACEMENT $50 $80.00
MATERIALS      COST PLUS 5%
BACKHOE $90.00 PER HR
   
H            SERVICES
POOL FILLING           LABOR COST PLUS WATER COST.    
       (CALL WITH POOL SIZE FOR ESTIMATE)  
 
HYDRANT USE             LABOR COST PLUS WATER COST.    
                       (CALL FOR ESTIMATE)  
     
I BACKFLOW TESTING FEES*  INITIAL   RETEST   AFTER-HOURS TEST  
DEVICE SIZE IN INCHES  3/4 $35.00 $25.00 $85.00
DEVICE SIZE IN INCHES   1 $50.00 $40.00 $100.00
DEVICE SIZE IN INCHES 1 1/2 $50.00 $40.00 $100.00
DEVICE SIZE IN INCHES   2 $50.00 $40.00 $100.00
DEVICE SIZE IN INCHES   3 $55.00 $45.00 $105.00
DEVICE SIZE IN INCHES   4 $60.00 $50.00 $110.00
DEVICE SIZE IN INCHES   6 $65.00 $55.00 $115.00
DEVICE SIZE IN INCHES   8 $70.00 $60.00 $120.00
* BACKFLOW TESTING IS PERFORMED BY THE WATER DEPARTMENT'S CERTIFIED TESTERS.
SEMIANNUAL TESTING IS REQUIRED ONE OF WHICH NEEDS TO BE DONE BY DEPARTMENT.
J FIRE PROTECTION (SPRINKLER)       $100 ANNUALLY   BILLED FIRST QUARTER
   
K METER TESTING* $30.00
*TESTING PERFORMED BY WATER DEPARTMENT ACCORDING TO AWWA STANDARDS.
 IF THE METER IS FOUND TO BE INACCURATE THE FEE WILL BE WAVIED
L TEMPORARY WATER SERVICE $150.00   PLUS WATER USAGE    
 
M FINES
UNAUTHORIZED WATER USE FINE $500.00 PER DAY
UNAUTHORIZED UNIT INSTALLED $100.00 PER DAY
Failure to disconnect cross connection $100.00 PER DAY  
Illegal cross connection $1,000.00
Tampering $500.00